This petition is now closed, as its deadline has passed.
We the undersigned petition the Prime Minister to Set a 3 ton weight limit on the A57 (Snake Pass) between Glossop and the Ladybower Reservoir. More details
Submitted by Peter Holt – Deadline to sign up by: 19 August 2008 – Signatures: 24
Every winter, Snake pass is closed to traffic because large lorries shed loads or skid because of icy conditions on this route. The road needs constant repair due to excessive wear by large vehicles, causing route closures, and the A57 is likely to require extensive closure this summer due to landslip, again caused by heavy vehicles. The 2 alternative cross Pennine routes, the A628 (Woodhead Pass) and the M62 are more suitable for heavy vehicles, as they are less undulating and have less steep gradients.
Peter Holt, the Petition Creator, joined by: