This petition is now closed, as its deadline has passed.
We the undersigned petition the Prime Minister to .stop the expansion of Peasons recycling located in rural Norfolk within a quarter of a mile of East Wretham. More details
Submitted by Matthew Abrey – Deadline to sign up by: 29 April 2008 – Signatures: 272
This site labelled as WAS 03 is proposing to be used for composting, anaerobic digestion, processing of recyclables, mixed waste processing, inert waste recycling, thermal treatment, and waste transfer. The site will be 5.27 hectares of which is woodland that was planted in remembrance of the war. There are 5 dwellings that border this site, two of which are under 15 meter from the boundary. We believe that the site already allocated to Pearsons(Thetford) Ltd is large enough and does not need to increase by this large amount (an increase of nearly 220%) destroying these woodlands!
Matthew Abrey, the Petition Creator, joined by: